Navigational Directions
Lateral markers with day shapes and lights placed on the bridge will direct vessels to navigate through bridge spans with unaffected air draft.
From Monday 6 May until 7 July 2024 vessels must navigate through bridge span 10.
Span 10 has an air draft of 12m.
Navigation Infographics
Navigation under the San Remo Phillip Island Bridge between Span 10 for both to port and to sea from Monday 6th of May 2024 until Sunday 7th July 2024.
Works Area
The bridge has 19 spans and up to 3 spans will be scaffolded at any one time reducing the navigable air draft underneath the bridge by 2.5 meters.
The navigable spans of the bridge, (span 6 to 16) will be affected by the scaffold from the 6th of May until approximately October 2024. One of the center spans, (9 to 11) will always remain at full air draft with lateral markers.
Please observe the lateral markers as they will change location over the course of the project.
Contact us
For more information, please contact the project team via bridgebridgeproject@westernportwater.com.au or call 1300 720 711.