Load Limits for Emergency & Emergency Preparedness Vehicles whilst scaffolding is installed for the 30m length spans of the Phillip Island / San Remo Bridge.
Emergency & Emergency Preparedness Vehicles
Mapped Network Name | Existing Mapped Status | Mapped Status during works | Note for applicable operator(s); Advice on how to seek access during the works |
---|---|---|---|
Emergency Response & Preparation Combinations (up to 46.0t & 3.0m wide) | Approved | Conditionally Approved | Conditional access. Vehicles at or below 42.5 tonnes GCM will be approved for access via map. Permits, obtained from the NHVR, will be required for access above 42.5 tonnes, to be considered on a case-by-case basis, dependent on time of day and traffic management conditions. |
Emergency Response & Preparation Combinations (up to 78.5t & 4.0m wide) | Approved | Conditionally Approved | Conditional access. Vehicles at or below 42.5 tonnes GCM will be approved for access via map. Permits, obtained from the NHVR, will be required for access above 42.5 tonnes, to be considered on a case-by-case basis, dependent on time of day and traffic management conditions. |
Unimog 4000M Fire Trucks | Approved | Approved | No operational impact |